The 25/14 through 25/24 reports from across the four axes are now consolidated in the public publications index. Highlights include the durable agent substrate v1 release (25/14), the compositional latent dynamics paper (25/09 — released last quarter, now consolidated), and the second iteration of the modification-under-review protocol used inside the RSI axis.
Two of the eleven reports are released with a delay window per the staged-publication policy: 25/19 (RSI-axis run report) and 25/22 (capability evaluation methodology, dual-use). A third — 25/23 — is held indefinitely pending interpretability sign-off, which is the eighth piece of work held under the indefinite-hold provision since the protocol was adopted in 2022.
A third — 25/23 — is held indefinitely pending interpretability sign-off, which is the eighth piece of work held under the indefinite-hold provision since the protocol was adopted in 2022.
As always, every report carries the metadata that the index requires: producing cell ID, paired interpretability cell, compute consumed, pre-registration date, and stopping conditions if applicable. The index itself is signed by the long-tenured-contributor quorum that approved the release window.
For the protocol details behind anything mentioned above, see /governance and /charter. For the structural commitments, /about.